Szabadics co. ltd.

Contact
  • Address: 8749 Zalakaros,
    Jegenye sor 3.
  • Phone: +36-93/541-920
  • Email: info@szabadics.hu

Project's name Main features Amount Construction period Watercourse settlement's subtotal
Development of the water recharge system on the protected side and the rehabilitation of the pipe system on the protected sidein Szigetköz Main quantities: Lakebed rehabilitation: 117 km; Evolving of new lakebed: 14 km; Ground works: 410 ezer m3; 8 288 493 € 2012.05.10. - 2014.12.23.   4 384 335 €
Implementation of the water protection system project of Kis-Balaton within the framework of the second implementation phase • Building of dyke: 3,649 km long
• River channel dredging: 12,149 km long (51100 m3)
• The dredging of Zala lakebed: 7,990 km long (67350m3) • Reno mattress building: 3300 m2
• 5/40kg Armourstone: 1620 m3
• Covering river channels: 3359 m2
11 034 600 € 2012.04.13. - 2014.12.09. 1 451 266 €
Water recharging of the lower section of the Ásványi branch system, the Bagaméri branch system ágrendszer and the Patkányosi branch system in Szigetköz Implementation of water recharging of the lower section of Ásványi,- Bagaméri,- Patkányosi branch system; Establishment of a estuary bottom line and a fish ladder: 3 pcs; Dredging of river branches: 16 pcs; Altering of intermediate structures; Main quantities: Hydraulic engineering structures: 73.700 m3; Buidling of sand gravel: 47.455 m3; Ground works: 180.100 m3; Setting filter cloth: 30.400 m2 7 064 648 € 2012.05.10. - 2015.04.02. 806 041 €
The water level controlling channel's dredging of Ingó, and appropriate slurry spreading extension in the river side • Remove of plants from the bank and from the lakebed: 14425m2
• River channel dredging: 10702m3
46 160 € 2014.09.17. - 2014.12.09. 46 160 €
Reconstruction of the reedy areas of Lake Fertő and the water recharging canals of the lakebed Dredging works 76,3 km as long as Hungary's complete area of Lake Fertő 2 443 947 € 2014.07.16. - 2015.09.28. 2 443 947 €
Levelling the Dráva-Mura river mouth section River control and foreshore protection 15.000 t with using armourstone 1 655 280 € 2010.02.19. - 2011.02.17. 1 655 280 €
Revitalisation of the Nagy-Pándzsa watershed Hydro-mechanisation: 30.000m3; Dredging: 68.000m3 2 407 863 € 2009.10.20. - 2011.09.30. 2 407 863 €