Project's name Main features Amount Construction period Wastewater treatment's subtotal
Constructing and planning of the sewerage system and water treatment plantof Somogytúr SBR biological wastewatercleaner/ Sequencing Batch Reactor /periodic intake livingsurry/ technology, organic removal with nitrification, biological, chemical dosage with phosphor removal.
- hydraulics capacity: 360 m3/day
- biological capacity 4.110 LEÉ
9 514 533,88 € 2014.03.18 - 2016.12.12.   1 170 533,88 €
The capacity expansion of the sewage treatment plant in Keszthely and the building of related slurry treatment plants Plant developing from 89583 to 120900 LEÉ, new premechanic, sandcatch, pre-settling, biological places renewal, post-settling conversion, new bloover engine room, UV fertőtlenítand. 8 465 535,21 € 2013.10.17. - 2015.05.29.  
Construction of sewage system and sewage treatment plant in Bácsalmás Wastewater cleaner plant construction, with the continuously usage of the existing plant. The new plant Circulator/SBR technology the flow-through living Surry technology periodic (SBR) plant. 800 m3/day clearable wastewater amount. 7600 LE. Operation parameters: chemical usage 18,53 kg/day, electricity usage 730 KWh/day,
waterless slurry amount 0,298 t / day
8 210 300,00 € 2013.10.10. - 2015.06.01. 1 296 190,00 €
Construction of sewage system and sewage treatment plant in Nagybajom 375 m3/day SBR plant construction, balancer piece, 120m2 operator building 4 593 833,33 € 2013.10.08.- 1 076 666,67 €
Development of the sewage system and sewage treatment plant in Nagyatád and its surroundings Plant developing from 34930 to 45890 LEÉ Bardenpho system. New premechanic (coarse grid and fine grid) sandcatcher renewal, old biological reservoir conversion anaerob and anox places. 5000m3-es biological piece construction, post-settling renewal. 15 364 300,00 € 2013.08.14. - 2015.10.29. 3 724 000,00 €
Development of the wastewater treatment plant of Pilisvörösvár Main technology engineering room: mechanical grid, aereted sand and grease cacher equipment; separator; technology operator room, engine room; raw wastewater amount measurement; sniffered wastewater taker station; redundand-slurry amount measurement and handling; grid waste; slurrywater disinfectant engine-room
BIOCOS system biological cleaner piece.
1st clearing line: mark „B” aerob-anoxikus reservoir; V=1.566,6 m3/pcs; mark „SU” mixer-jig reservoir; V=483 m3/pcs, deflector spill-over shaft
2nd clearing line: mark „B” aerob-anoxikus reservoir; V=1.566,6 m3/pcs, „SU” jelű mixer-jig reservoir; V=483 m3/pcs, deflector spill-over shaft
disinfectant and washer water holding piece; Muzzle piece (existing) renewal; Gravity slurry compressor piece; above V= 200 m3; Compressed slurry holder, Biofilter
2 486 078,57 € 2013.07.30. - 2015.08.11. 2 486 078,57 €
Expansion and development of the wastewater treatment plant of the Révfülöp agglomeration Plant developing from 9333 to 18200 LEÉ, new premechanic, sandcatch, postsettlement, UV disinfectantion and safety reservoir construction. H2S alarm system and automatic engine-room ventilation system construction. 1 798 332,39 € 2013.04.30. - 2014.11.28.  
Building the sewage system and wastewater treatment plant in the village Segesd 230 m3/d capacity SBR system wastewatercleaner plant (2 500 LEÉ) 2 788 626,67 € 2013.04.08. - 2015.04.08 716 666,67 €
Development of the municipal wastewater treatment plant of Tab SBR biological wastewatercleaner/ Sequencing Batch Reactor /periodic intake livingsurry/ technology, organic removal with nitrification, with nitrification nitrification, randzleges, biological, chemical dosage with phosphor removal.
- hydraulics capacity: 950 m3/day
- biological capacity 7.740 LEÉ
1 330 933,33 € 2013.02.27. - 2014.08.24. 1 330 933,33 €
"Solving the problems of sewage disposal and the treatment in the settlement of Ádánd by establishing the sewerage system and building a wastewater treatment plant" SBR biological wastewatercleaner/ Sequencing Batch Reactor /periodic intake livingsurry/ technology, organic removal with nitrification, with nitrification nitrification, randzleges, biological, chemical dosage with phosphor removal.
- hydraulics capacity: 230 m3/day
- biological capacity 2.300 LEÉ
3 112 666,67 € 2012.11.29. - 2014.11.28 360 000,00 €
Constructing the sewage disposal system and wastewater treatment plant of Kadarkút 280 m3/d capacity wastewatercleaner plant (2 895 LEÉ) 3 127 104,18 € 2012.08.14. - 2014.06.27. 483 333,33 €
Solving the sewage disposal of the municipality of Kaposmérő SBR system 280m3/d 2 431 156,67 € 2012.07.18. - 2014.04.09. 607 789,33 €
The complete construcion works of the sewage disposal system and wastewater treatment plant of the village of Iregszemcse 230 m3/day hydraulics capacity SBR system wastewatercleaner plant. 3 596 544,35 € 2012.07.06. - 2014.05.27. 416 666,67 €
The complete construction works of the wastewater treatment plant of Cece SBR biological wastewatercleaner/ Sequencing Batch Reactor /periodic intake livingsurry/ technology, organic removal with nitrification, with nitrification nitrification, randzleges, biological, chemical dosage with phosphor removal.
- hydraulics capacity: 220 m3/day
- biological capacity 2.644 LEÉ
715 983,33 € 2012.03.09. - 2014.11.25. 2 386,61 €
In the project "The development of the sewerage system and wastewater treatment plant in the Nagykanizsa agglomeration" the expansion of the sewerage system Mechancal cleaning: new closed gridfilter contuction, 2 pcs paralel 3 mm rod offset, mechanicaly cleaned grid construction, 1600 m3/h/unit capacity; sandcatcher construction, engineering renewal, new blower construction; new slurrywasher/watert decontaminator equipment with 80 m3/h capacity; new rainwater pump station construction; new biological transfer at the watercontrol; new sniffled wastewater taker station construction with 422 m3/d capacity; new canalslurry taker construction
biological cleaning: new biological cleaner pieceak construction with anaerob, anoxikus and aerob places, pieces usable volume 2 x 8 200 m3, altogether 16 400 m3; Existing Dorr type post-settlement piece construction and engineering renewal; New slurry and nitrate recirculation; Disinfectant engine room and the disinfectant dosage renewal; Cleared wastewater amount measurement renewal
9 640 000,00 € 2011.11.28 - 2014.01.16. 4 640 000,00 €
Executing the investments aimed at expanding and modernising the wastewater treatment plant in the area of the Veresegyház agglomeration 3 000 m³/d capacity wastewatercleaner plant expand with 2 000 m³/d capacity, technology developed with biological clearence membrane-bioreactoro technology,
Mechanical split-level precleaning system 200 m2 new buildin with the necessary technology equipments: biological cleaning: 2 paralel working biological line, serial anoxic and aerob renewed reservoir, smallcircle nitrate-recirculate, bigcircle slurry,- and nitrate-recirculate, slurry-stripping reservoir
Phase separation: membrane reservoirs with ultrafilter membranes
Safety UV disinfectantion.
4 555 553,33 € 2011.08.31 - 2012.09.01. 4 555 553,33 €
Sewage collection and disposal from the area of Vasvár agglomeration Wastewaterplant capacity expansion from 4500LEÉ to 5790LEÉ Cleartec stable adapter technology. Solving of the wastewater delivery equalization. 4 074 666,67 € 2010.12.08 - 2013.10.25.  
Building the sewerage system and wastewater treatment plant of the village of Rábahídvég 107m3/day capacity BIOCOS type plant construction 1 402 733,33 € 2010.10.25 - 2012.07.19.  
Building the sewerage system and wastewater treatment plant of the village of Egyházaskozár 1 pcs 103 m3/d reed-based wastewatercleaner 1 433 000,00 € 2010.09.22 - 2012.06.30. 346 853,73 €
Solving the sewage disposal and sewage treatment of Győrsövényház OMS technology with biological cleaner plant 90 m3/d capacity 1 164 333,33 € 2010.09.15 - 2012.02.29. 300 000,00 €
Solving the sewage disposal and sewage treatment of the villages of Urainewfalu and Vámoscsalád 140m3/day capacity BIOCOS type plant construction 1 866 000,00 € 2010.08.10 - 2012.03.31.  
Solving the sewage disposal and sewage treatment of the village of Belezna 1 pcs 120 m3/d fixed layer biological filtered wastewatercleaner plant 1 346 000,00 € 2010.07.28 - 2012.06.30 471 900,00 €
Constructing the sewerage system and sewage disposal of the villages of Vande and Nemesdéd wastewatercleaner plant: 90 m³/day hydraulics capacity 1 880 666,67 € 2009.07.14 - 2011.03.31. 520 000,00 €
Constructing the sewerage system and sewage disposal of the villages of Kurd 120m3/day capacity rotary disk based aeration wastewaterplant construction, premechanics , and with split-level jig. 1 717 333,33 € 2009.06.12 - 2011.01.14. 623 333,33 €
In the project "Developing the wastewater treatment and sewerage system of the Zalaegerszeg agglomeration - phase II." and further development of regional sewerage system 1 leachatewater treater proper system construction (DEMON technology), 1 pcs billet condenser renewal, 2 pcs billet change, 1 pcs hypofeeder construction, 1 pcs sandcatcher renewal 4 836 658,00 € 2009.05.22 - 2010.08.30.  
Constructing the sewerage system and sewage disposal of the villages Káld, Borgáta, Egyházashetye and Köcsk 175m3/day capacity SBR type plant construction 5 335 663,33 € 2006.10 - 2008.12.31.  
Sewage disposal and sewage purification of the villages Csempeszkopács, Ikervár, Rum and Meggyeskovácsi wastewaterplant construction: 610 m3/d hydraulics capacity, contains
- 510 m³ Communal wastewater
- 100 m³ Settlement liquid waste
8 086 960,00 € 2006.08.14 - 2009.06.27 1 166 666,67 €
Solving the sewage disposal of the region of Csurgó 1800 m3/day capacity 11 954 616,67 € 2002.07 - 2005.07.