Project's name Main features Amount Construction period System establishment's subtotal
"Water management of the Ráckeve (Soroksári-Dunube-Ágg (RSD) and improving water quality project - planning activities and the fulfillment of the river side project's construction works Inlet (Depressed): 4 436 pcs, Private sink: 3 829 pcs, D 63-160 KPE depressed pipeline: 83.744 pcs, D 63 KPE depressed communal pipeline length: 37 736 m, Pump station architecture: 10 pcs, Communal pump station: 4 pcs, Existing pump station reconstruction: 3 pcs 22 942 870,00 € 2014.04.07. - 2015.10.26.   22 942 870,00 €
Planning and construction of Somogytúr's sewerage system and wastewater treatment facility Gravity main pipeline (DN200/KGEM) - 31 km; Communal inlet (DN160/KGEM) - 13,3 km; 1526 pcs, depressed main pipeline (DN90/PE) - 0,22 km; Depressed communal inlet - 3 pcs; communal pump station - 28 pcs; Standpipe (DN110/PE) - 27,8 km; Reticulate pump station - 23 pcs; KPE 25 water pipeline construction for pump station: 1.077 m; KPE 32 water pipeline construction for pump station: 229 m 9 514 533,88 € 2014.03.18 - 2016.12.12. 8 344 000,00 €
Construction of Kunszentmiklós town's sewerage system Wastewater system: 45 060 m, DN 200 KG-PVC gravity main pipeline 20 194 m, DN 150 KG-PVC inlet pipe 1 302 m, Gravity inlet reconstruction 2 569 pcs, Communal wastewater standpipe DN200-50: 4.115 m; Reticulate pump station: 10 pcs new and 1 pc reconstruction 7 248 070,42 € 2013.12.12. - 2015.10.14. 7 248 070,42 €
Construction of the sewerage system and purification of sewage in the town of Bácsalmás 37 574,3 m DN 200 KG-PVC gravity wastewater main pipe; 28 221,1 m DN 150 KG-PVC gravity inlet pipe,
2584 pcs communal inlet; Wastewater standpipe line: DN 225 KPE 15,9 mm, DN 110 KPE 714,1 m; 5 pcs Reticulate pump station construction with engineering, electricity and control; Bio filter: BZ 06 L type active bio filter
8 210 300,00 € 2013.10.10. - 2015.06.01. 6 914 110,00 €
Building and planning of the sewage disposal network and wastewater treatment plant of Nagybajom 15636 m main pipeline, 948 pcs inlet, 9115 m inlet pipeline, 326 pcs concrete shaft, 77 pcs communal pump station (CPS), 863 m CPS standpipe, 10203 m standpipe, 19 pcs (wash-up, vent, drain-shaft), 3560 m wastewater treatment plant's drink water pipeline, 11 pcs fitting shaft, 702 m cleared wastewater deflector, 1pcs monitoring well 4 593 833,33 € 2013.10.08.- 3 517 166,67 €
Developing the sewerage system of Nagyatád and its region as well as the wastewater treatment plant of Nagyatád 48430 m main pipeline, 3267pcs inlet, 34829 m inlet pipeline, 1052pcs conrete shaft, 39pcs CPS , 62295 m Standpipe, 118pcs (wash-up, vent, drain shaft), 27pcs Reticulate pump station shaft, 26pcs bio filter, 16 pcs LIMNOMOB"A" nitrate feeder, 9 pcs Mobil H2S measurer 15 364 300,00 € 2013.08.14. - 2015.10.29. 11 640 300,00 €
Construction the sewerage system of Sárvár and doing other additional works (in the areas of Sótonyi u. - Celli út - newhegyi u. - Kilátó u. and Iskola u ) 2604m main pipe, 72pcs inlet, 1pcs pump station, 856m Standpipe. 1292m Standpipe 489 993,33 € 2013.07.22. - 2014.11.30. 2013.10.01. - 2014.05.31. 489 993,33 €
Construction of the sewerage system and wastewater treatment plant of the village of Segesd 15.000m main pipe, 562 pcs inlet, 5pcs pump station, 5.321 m Standpipe. 2 788 626,67 € 2013.04.08. - 2015.04.08. 2 788 626,67 €
The development of Nagykanizsa agglomeration's sewerage system and wastewater treatment plant and the sewage diversion of village Rigyác - phase II. wastewater canal system: 1 089 m DN 200 KG-PVC Gravity main pipeline; 284 m DN 150 KG-PVC inlet pipeline; wastewater Standpipe: 897 m Reticulate pump station: 3 pcs 259 933,33 € 2013.02.27. - 2013.08.25. 259 933,33 €
The complete construction works of the wastewater treatment plant of Cece Gravity main pipeline (DN200/KGEM) - 20,1 km; Communal inlets (DN160/KGEM) - 9,4 km; 1113 pcs; Depressed main pipeline (DN90/PE) - 2,21 km; communal pump station - 28 pcs; Standpipe (DN110/PE) - 4,7 km; Depressed main pipeline (DN160/PE) - 0,53 km; Reticulate pump station - 8 pcs 3 486 000,00 € 2013.01.09. - 2014.11.25. 3 486 000,00 €
Construction of the sewerage system and building a wastewater treatment plant in the village of Ádánd Gravity main pipeline (DN200/KGEM) - 14,6 km; Communal inlets (DN160/KGEM) - 7,5 km; 841 pcs; Depressed main pipeline (DN90/PE) - 2,1 km; Depressed main pipeline (DN110/PE) - 2,8 km; Depressed communal inlet - 14 pcs; communal pump station - 15 pcs; Communal standpipe (DN63/PE) - 0,27 km; Reticulate pump station - 4 pcs 3 112 666,67 € 2012.11.29. - 2014.11.28 349 624,44 €
Solving the sewage disposal of Vaspör and its region 9300m main pipe, 419pcs inlet, 8pcs pump station, 12pcs CPS, 12400m Standpipe 2 000 626,67 € 2012.09.12. - 2013.10.31. 2 000 626,67 €
Construction of the sewage disposal system and wastewater treatment plant of Kadarkút wastewater canal system: 12 171,5 m DN 200 KG-PVC Gravity pipeline, 8 794,9 m DN 150 KG-PVC inlet pipeline, 867 pcs communal inlet, 198 pcs cleaner shaft; wastewater Standpipe: 2 471,6 m DN 160 KPE, 607,9 m DN 90 KPE, 360,1 m DN 90 KPE, 2 053 m DN 125 KPE, 1 220,8 m DN 110 KPE, Reticulate pump station: 5 pcs, Cleared water diverting: 806,3 m DN 200 KG-PVC Gravity pipeline and 17 pcs shaft 3 127 104,18 € 2012.08.14. - 2014.06.27. 2 643 770,85 €
Solving the sewage disposal of the municipality of Kaposmérő 10056 m main pipeline, 815pcs inlet, 7475 m inlet pipeline, 3pcs CPS , 1292 m Standpipe, 3pcs (wash-up, vent, drain shaft), 2pcs Reticulate pump station shaft, 2pcs bio filter, 2 431 156,67 € 2012.07.18. - 2014.04.09. 1 823 367,33 €
The complete construcion works of the sewage disposal system and wastewater treatment plant of the village of Iregszemcse wastewater canal system construction: 15 625 m NA 200 KG-PVC main pipeline, 7 672 m NA 150 KG-PVC inlet pipeline, 1 588 m D 63 KPE inlet Standpipe, Standpipe system: 1 362,98 m D 90 KPE, 444,21 m D 110 KPE, 237,41 m D 160 KPE, 843,5 m D 225 KPE, 5 pcs Reticulate pump station, 1 000 pcs communal wastewater inlet 3 596 544,35 € 2012.07.06. - 2014.05.27. 3 179 877,69 €
Construction of the sewerage system of the villages of Sántos and Szentbalázs 5684 m main pipeline, 317pcs inlet, 3148 m inlet pipeline, 19pcs CPS , 4618 m Standpipe, 8pcs (wash-up, vent, drain shaft), 2pcs Reticulate pump station shaft, 2pcs bio filter, LIMNOMOB"A" nitrate feeder 2pcs, 1pcs H2S measurer 1 149 000,01 € 2012.04.16. - 2013.07.05. 1 149 000,01 €
The complete construction works of the sewage disposal systems of the villages of Dencsháza and Hobol as well as carrying out a test run 6123 m main pipeline, 381pcs inlet, 4090 m inlet pipeline, 3pcs CPS , 10747 m Standpipe, 10pcs (wash-up, vent, drain shaft), 4pcs Reticulate pump station shaft, 3pcs bio filter, 5 pcs compressed drain equipment 1 823 333,33 € 2012.04.13. - 2013.07.17.  
Solving the sewage disposal of the region of Csurgó NA 200 KG-PVC main pipeline: 6.515,02 m NA 160 KG-PVC inlet pipeline (D40 KPE pipelines): 5.296,81 m wastewater inlet: 499 pcs communal pump station shaft: 18 pcs Standpipe (DN25-110) altogether: 18.573,52 m; wastewater pump station: 5 pcs 1 516 600,00 € 2012.02.27 - 2013.03.29. 1 516 600,00 €
Within the framework of project phase I. "Drinking water improvement program for Dombóvár and its region and the construction of the sewerage system" : The construction of sewage disposal system and refurbishment of Dombóvár's unsupplied areas including newdombóvár, Dombóvár-Szőlőhegy Gravity wastewater main pipeline: NA 200 KG PVC 32.446,4 m, directed drilling NA 200 KPE 170 m, reconstruction NA 400 KG PVC 1.163 m, wastewater Standpipe: NA 90 KPE 3.285,9 m, NA 63 KPE 785,3 m, communal inlets: 2.466 pcs, communal wastewater pump stations: newly built pump stations: 7 pcs, reconstructions pump stations: 3 pcs, 5 159 330,00 € 2011.04.07 - 2012.12.29. 5 159 330,00 €
"The development of Nagykanizsa agglomeration's sewerage system and wastewater treatment plant" project - the construction works involved in the expansion of the sewerage system of the north-western and the south-western regions NA200 enamelled stone Gravity main pipe canal: 3.666.68 m, NA200 KG-PVC Gravity main pipe canal: 39.513,88 m, D219 corrosin-proof Gravity canal: 24,31 m, D229 corrosion-proof Gravity canal: 1,52 m; D50-180 KPE standpipe: 59.459,52 wastewater inlets: 2.700 pcs. pump stations: regional wastewater pump station: 5 pcs, Reticulate wastewater pump station: 22 pcs, pomological point: 6 pcs; measurer point: 4 pcs; open ditch waterless made pipeline:38.963 m. 12 620 000,00 € 2011.01.28 - 2013.06.08. 12 620 000,00 €
Expanding the sewerage systems in Székesfehérvár, City with county rights and its region (Pákozd, Pátka, Seregélyes) Gravity main pipeline (≤DN300) - 84,5 km; Gravity main pipeline (>DN300) - 8,9 km; Communal inlets (DN160/KGEM) - 50 km; 6.520 pcs; Depressed main pipeline (≤DN300/PE) - 28,2 km; communal pump station - 253 pcs; Reticulate pump station - 27 pcs 26 101 456,67 € 2011.01.11 - 2012.10.30. 26 101 456,67 €
Sewage collection and disposal from the area of Vasvár agglomeration 18276m main pipe, 1035pcs inlet, 13pcs pump station, 68pcs CPS, 8545m Standpipe. 4 074 666,67 € 2010.12.08 - 2013.10.25.  
Executing the investments aimed at expanding and modernising the wastewater treatment plant in the area of the Veresegyház agglomeration wastewater pipeline construction: 452,4 m DN 250 KG-PVC, 13 192,9 m DN 200 KG-PVC; 6 682 m DN 160 KG-PVC communal inlet pipeline; Reticulate pump station: 7 pcs; communal pump station: 77 pcs; cleaner shaft: 860 pcs; Standpipe construction (DN90-50): 2.951.4 m; 1 999 533,33 € 2010.11.12 - 2012.11.12. 1 999 533,33 €
Building the sewerage system and wastewater treatment plant of the village of Rábahídvég 7200m main pipe, 389pcs inlet, 4pcs pump station, 1100m Standpipe, 107m3/day new wastewater plant construction 1 402 733,33 € 2010.10.25 - 2012.07.19.  
Building the sewerage system and wastewater treatment plant of the village of Egyházaskozár NA 200 KG-PVC main pipeline: 6.391,82 m, NA 160 KG-PVC inlet pipeline: 2.871,11 m, wastewater inlet: 374 pcs, Standpipe altogether: 1.609,38 m from D110 KPE : 998,01 m, D90 KPE material: 621,37 m, wastewater pump station: 5 pcs 1 433 000,00 € 2010.09.22 - 2012.06.30. 1 086 146,27 €
Solving the sewage disposal and treatment of the village Győrsövényház wastewater canal system construction: 4 979 m DN 200 KG-PVC Gravity wastewater main pipeline; 3 816 m DN 150 KG-PVC Gravity inlet pipeline; 339 pcs communal inlet; wastewater Standpipe: 2 623 m DN 110 KPE, 428 m DN 90 KPE; Reticulate pump station: 3 pcs; Cleared water diverting: 440 m D 110 KPE Standpipe; thumb-latch: 2 pcs DN 100 1 164 333,33 € 2010.09.15 - 2012.02.29. 864 333,33 €
Solving the sewage disposal and treatment of the villages Urainewfalu and Vámoscsalád 10100m main pipe, 573pcs inlet, 3pcs pump station, 4100m Standpipe, 140m3/day new wastewater plant construction 1 866 000,00 € 2010.08.10 - 2012.03.31.  
Solving the sewage disposal and treatment of the village Belezna NA 200 KG-PVC main pipeline: 6.885,18 m, NA 160 KG-PVC inlet pipeline: 2.732,49 m, 100-as átmeasurerjű beton cleanershaft: 178 pcs, wastewater inlet: 322 pcs, communal pump station shaft: 1 pcs, D 90 KPE Standpipe: 1.359,91 m, wastewaterpump station: 2 pcs 1 346 000,00 € 2010.07.28 - 2012.06.30 874 100,00 €
Constructing the sewerage system of the Rábasömjén district of Sárvár and the village of Rábapaty 15700m main pipe, 1005pcs inlet, 7pcs pump station, 5200m Standpipe 2 499 666,67 € 2010.03.08 - 2011.12.31. 2 499 666,67 €
Constructing the sewerage system and sewage disposal of the villages of Vande and Nemesdéd NA 200 KG-PVC main pipeline: 8 654,34 m; NA 150 KG-PVC inlet pipeline: 5 500,73 m; 1 m Ø betonshaft: 165 pcs; 400-as műanyag shaft: 83 pcs; wastewaterinlets number: 624 pcs; Standpipe altogether (D125-D50): 8 442,18 m; wastewaterpump station (in public place situated): 3 pcs; communal pump station: 5 pcs 1 880 666,67 € 2009.07.14 - 2011.03.31. 1 360 666,67 €
Constructing the sewerage system and sewage disposal of the villages of Ságvár NA 150-200 KG-PVC Gravity hálózat construction 2 602 666,67 € 2009.06.17 - 2010.12.17.  
Constructing the sewerage system and sewage disposal of the villages of Kurd 6700m main pipe, 446pcs inlet, 7pcs pump station, 1200m Standpipe, 120m3/day new wastewaterplant construction 1 717 333,33 € 2009.06.12 - 2011.01.14.  
Developing the wastewater treatment and sewerage system of the Zalaegerszeg agglomeration - phase II. Magistery canal construction Zalaegerszeg Becsali, Egerszeghegyi, Platán lane and few downtown's street at 4. 713 m length. 4 836 658,00 € 2009.05.22 - 2010.08.30. 1 265 400,00 €
In the project "Developing the wastewater treatment and sewerage system of the Zalaegerszeg agglomeration - phase II." and further development of regional sewerage system - phase I. : carrying out of building the sewerage system's new tasks connected to the north-eastern collector D200 KG Gravity canal: 1.073 m, D63 standpipe: 315 m, pump stations: Reticulate and regional: 15 pcs 2 743 007,00 € 2009.03.16 - 2010.08.30. 2 743 007,00 €
In the project "Developing the wastewater treatment and sewerage system of the Zalaegerszeg agglomeration - phase II." the further development of regional sewerage system - phase III.: carrying out of building the sewerage system's new tasks connected to the north-western collector D200 KG Gravity canal: 11.382 m, D63 standpipe: 5 001 m, D90 standpipe: 394 m, pump stations: Reticulate and regional: 12 pcs, Local: 1 pcs, KCPS: 2 pcs 4 144 825,00 € 2009.03.16 - 2010.08.30. 4 144 825,00 €
Establishing the sewerage system of the village of Sávoly DN 150-200 KG-PVC main pipe and inlet pipeline 8.036 m; DN 160 KPE Standpipe 2917 m; 3 pcs wastewaterpump station 1 076 993,33 € 2008.10.22 - 2009.10.02. 1 076 993,33 €
Constructing the sewerage system and sewage disposal of Őrbottyán and its region Gravity main pipeline construction: KG PVC D200 92.729 m; KG PVC D315 5.241 m; inlet pipeline construction: KG PVC D160 6.299 m (6.697 pcs); communal pump station: 306 pcs; Depressed pipeline construction (D50-280 KPE):26.8032m, (D110-280):6.550m; Beton cleanershaft construction 1.781 pcs; Műanyag cleanershaft construction 1.141 pcs; Reticulate pump station 27 pcs; Vacuum groundwater sinking 18 000 m 18 272 000,00 € 2008.09.15 - 2010.09.30. 18 272 000,00 €
In the project "Zalaegerszeg and its region - sewerage system and wastewater treatment plant" the further development of the regional collecting system and the sewerage systems 10 settlements and 14 districs of Zalaegerszeg - phase III. connected to the north-western collector (phase I.) D200 ka. Gravity canal: 2 997 m, D200 KG Gravity canal: 39 206 m, D63 standpipe: 2 058 m, D90 standpipe: 3 022 m, D110 standpipe: 1 693 m, D160 standpipe: 5 640 m, D200 standpipe: 3 631 m, wastewater inlets: 2 218 pcs (12 319 m D160 KG-PVC inlet pipeline), pump stations: Reticulate and regional:12 pcs, KCPS:12 pcs, road renovation: 95 700 m2 9 398 322,00 € 2007.03.14 - 2010.06.30. 9 398 322,00 €
In the project "Zalaegerszeg and its region - sewerage system and wastewater treatment plant" the further development of the regional collecting system and the sewerage systems 10 settlements and 14 districs of Zalaegerszeg - phase I. north-eastern collector (phase I.) D200 ka. Gravity canal: 3962 m, D200 KG Gravity canal: 16592 m, D63 standpipe 1034 m, D90 standpipe 2865 m, D110 standpipe 795 m, D125 standpipe 7306 m, D160 standpipe 9102 m, D200 standpipe 725 m, wastewater inlets: 1089 pcs (7483 m D 160 KG-PVC inlet pipeline), pump stations: Reticulate and regional: 14 pcs, KCPS: 8 pcs, Szivattyúcsere: 4 pcs, road renovation: 61.953 m2 6 540 346,00 € 2007.03.14 - 2009.05.30. 6 540 346,00 €
Constructing the sewerage system and purifying the sewage of the villages of Káld, Borgáta, Egyházashetye and Köcsk 20100m main pipe, 1429pcs inlet, 12pcs pump station, 14100m Standpipe, 175m3/day new wastewater plant construction 5 335 663,33 € 2006.10 - 2008.12.31.  
Constructing the sewerage system of the villages of Mernye, Orci, Zimány, Patalom, Magyaratád, Somogyaszaló-Antalmajor DN 150-200 KG-PVC main pipe and inlet pipeline 59.976 m; DN 90-200 KPE Standpipe 32.216 m; 16 pcs wastewaterpump station 6 279 200,00 € 2006.10.01 - 2008.10.09. 6 279 200,00 €
Sewage disposal and sewage purification of the villages Csempeszkopács, Ikervár, Rum and Meggyeskovácsi Gravity wastewaterpipeline: NA 150 KG-PVC 16.411,80 m inlet pipeline; NA 200 KG-PVC 28.692,68 m, NA 300 KG-PVC 201,10 m; wastewaterinlet 1.666 pcs; wastewater Standpipe (D63-D200): 31.117,91 m; Reticulate (in public place situated) pump station: 16 pcs 8 086 960,00 € 2006.08.14 - 2009.06.27 6 920 293,33 €
Constructing the sewerage system and sewage diversion of the villages of Komló-Sikonda, Bodolyabér, Liget, Magyarhertelend, Magyarszék, Mánfa and Mecsekpölöske DN 150-200 KG-PVC main pipe and inlet pipeline 59.976 m; DN 90-200 KPE Standpipe 17.463 m; 27pcs wastewaterpump station 7 223 583,33 € 2005.12.08 - 2008.01.31. 7 223 583,33 €
Constructing the sewerage system of the village of Kapospula DN 150-200 KG-PVC main pipe and inlet pipeline 7.699 m; DN 90 KPE Standpipe 1703 m; 2 pcs wastewaterpump station 818 566,67 € 2005.05 - 2006.11. 818 566,67 €
Constructing the regional sewerage systems' main sewerage of Nagykanizsa south-estern collector DN 150-200 KG-PVC main pipe and inlet pipeline 38.000 m; DN 90-200 KPE Standpipe 26.700 m; 17 pcs wastewaterpump station 5 262 083,33 € 2004.11 - 2007.03.01 5 262 083,33 €
The construction of the sewerage system of Balatonfenyves according to phase B. IX. DN 150-200 KG-PVC main pipe and inlet pipeline 17.000 m; DN 160 KPE Standpipe 727 m; 1 pcs wastewaterpump station 1 025 240,00 € 2003.08 - 2004.11. 1 025 240,00 €