Komárom-Almásfüzítő’s main dam’s project

The flood protection was carried out in the endangered built-up areas by building a new dam and with the reinforcement of the 14,3 km long dam, which is protected by Komárom-Almásfüzitő’s main dam.
With the fulfilment of the project, more than 22 thousand people came to safer situation from floods. The dam is also good for protecting valuable industrial and trading areas against the floods on the Danube. This dam was made of 620 000 m3 rampart, 890 m long ferroconcrete flood protection wall, 21 700 m3 ashlaring spread, 45-60 cm thick laid at 14 500 m2 concrete ashlaring wrap and 695 m3 ferroconcrete pieces.