Project's name Main features Amount Construction period Flood and inland inundation's subtotal
Development of the water recharge system on the protected side and the rehabilitation of the pipe system on the protected side along with the water recharging, water retention and water level controlling structures in Szigetköz Main quantities: Rehabilitation of lakebed: 117 km; Dredging a new lakebed: 14 km; Ground works: 410 000 m3; 8 288 493 € 2012.05.10. - 2014.12.23.   27 628 €
Implementation of the water protection system project of Kis-Balaton within the framework of the second implementation phase Building of dyke: 5,8326 km long 110 620 m3
Building dam with soil: 2,7 km long 6 520 m3
River channel building: 3,649 km long
River channel dredging: 12,149 km long (51100 m3)
The dredging of Zala lakebed: 7,990 km long (67350m3) Covering river channel: 3359 m2
11 034 600 € 2012.04.13. - 2014.12.09. 1 814 955 €
Development of the flood control section of the River Mura Building of dyke: 9,393 km long in the flood protection section
Building dam crest protective covering 27.956 m2
Building land filling into flood protection dam 201.040 m
390/250 kg armourstone, stone pile 38 m3
40/200 kg armourstone, stone pile 10.500 m3
Covering river channel:
o Road surfaces on crushed stone 128 m2 (44,75m3)
o Road surfaces on concrete bed 350 m2 (122m3)
Stabilisation under soil:
o Geotextile 10.090 m3 (10.985 m2)
o Clay plug 9.283 m3 (5.919 m2)
Nyomáscsökkentő kút építése: 93db
4 963 000 € 2015.06.30. - 2015.11.11. 4 373 547 €
The water level controlling channel's dredging of Ingó, and appropriate slurry spreading extension in the river side • Remove of plants from the bank and from the lakebed: 14425m2
• River channel dredging: 10702m3
46 160 € 2014.09.17. - 2014.12.09. 46 160 €
Improvement of the safety of the flood control collection zone in Komárom, Almásfüzitő Building of new protection line 4.774 fm long, the extant protection line's height rectification 4.569 fm, flood protection wall's refurbishment 387 fm, complete reconstruction of the extant dyke with parapet walls 522 fm long 17 869 070 € 2013.12.16. - 2015.10.06. 1 153 705 €
Improvement of the safety of the partial collection zone for flood control on the right side of the River Marcal Building of flood protection dyke 13,275 km 9 221 191 € 2013.05.31. - 2015.10.06. 6 588 074 €
The reconstruction of the dykes damaged by the floods in 2013 in the area of Rába-Marcal Dredging works; Plant replacement tasks; Improvement of parapet wall; Channel reconstruction. Improving, reconstruction, stabilization of dam crest; Lakebed reconstruction tasks; Stabilization and improvement of foreshore wall. 632 013 € 2013.11.13. - 2014.05.31. 632 013 €
Development of the dyke on the left bank of River Dráva in the bay of Old Development of the flood protection dyke 5 km long 2 243 153 € 2009.03.09. - 2010.07.27. 2 243 153 €
Construction works of the reservoir in Lukácsháza Building a reservoir for flood reduction 4 983 573 € 2009.09.02. - 2010.10.12. 2 723 540 €