Project's name Main features Amount Construction period Floodgates' subtotal
Development of the water recharge system on the protected side and the rehabilitation of the pipe system on the protected side along with the water recharging, water retention and water level controlling structures in Szigetköz Sluices building and reconstruction: 54 pcs; Bridge reconstruction: 2 pcs; Culvert building and reconstruction: 39 pcs; Sluice board exchange: 12 pcs; Fish ladder building: 3 pcs; Siphonage: 2 pcs; Siphon restoration as protected monument: 1 pc , Main quantities: ferro-concrete: 1340 m3; reinforcing steel: 150 t; Other steel structures: 74 t; Armourstone: 8140 m3; Corrugated sheet iron structure: 750 m; Sluice board: 153 m2 8 288 493 € 2012.05.10. - 2014.12.23.   4 384 427 €
Implementation of the water protection system project of Kis-Balaton within the framework of the second implementation phase Water level controlling sluices: 2 pcs
Sluices, fish ladders, bridges: 19 pcs
Pump station's reconstruction: 6 pcs
11 034 600 € 2012.04.13. - 2014.12.09. 6 537 355 €
Water recharging of the lower section of the Ásványi branch system, the Bagaméri branch system and the Patkányosi branch system Altering the structures of the Ásványi branch: 8 pcs; Altering of Árvai sluices; Building fish ladders with steel bridge beams : 3 pcs; Main quantities: Ferro-concrete: 530 m3; Steel structure: 11,5 t; Back gauge installed downstream and upstream for a transmitter with a probe: 148 m 7 064 648 € 2012.05.10. - 2015.04.02. 806 123 €
Development of the flood control section of the River Mura Water level controlling sluices: 5 pcs
Restoration of dike-reeve settlement: 2 pcs
Restoration of flood protection centre: 1 pc
4 963 000 € 2015.06.30. - 2015.11.11. 798 642 €
Improvement of the safety of the flood control collection zone in Komárom, Almásfüzitő Restoration of double-structure (0+000 tkm) and building a pump substructure (11+180 tkm) 17 869 070 € 2013.12.16. - 2015.10.06. 1 213 268 €
Improvement of the safety of the partial collection zone for flood control on the right side of the River Marcal Construcion of Marcal's backwater sluice, Lacza sluice, Sárdoséri sluice, Sóstói sluice, Malom sluice, Sports field's sluice 9 221 191 € 2013.05.31. - 2015.10.06. 2 633 116 €
Construction works of the reservoir in Lukácsháza Construction of flood level controlling sluice 4 983 573 € 2009.09.02. - 2010.10.12. 1 642 467 €